VanEtten at Spring Meadow Condominium

 

NYS ICON13

Spring Meadow Condominium

The Spring Meadow Condominium requested resurfacing of their main road and parking lot. Resurfacing of the main road required 2 inches of existing asphalt be removed and replaced with 2 inches of new asphalt. Photos 1-4 are from this project.

The second project required complete removal of old asphalt and installation of 3 inches of new asphalt. Photos 5- 7 are from this project.

Photo 1 Main Road

Photo 1 Main Road

Photo 2 Main Road

Photo 2 Main Road

Photo 3 Main Road

Photo 3 Main Road

Photo 4 Main Road

Photo 4 Main Road

Photo 5 Parking Lot

Photo 5 Parking Lot

Photo 6 Parking Lot

Photo 6 Parking Lot

Photo 7 Parking Lot

Photo 7 Parking Lot