VanEtten at Spring Meadow Condominium

 

NYS ICON13

Previous  Photo

NavUp

Next Photo

Return To Spring Meadow Thumbs

Back To Home Page

Photo 1 Main Road

Photo 1 Main Road

Process of removing top 2 inches of asphalt

The Spring Meadow Condominium requested resurfacing of their main road and parking lot. Resurfacing of the main road required 2 inches of existing asphalt be removed and replaced with 2 inches of new asphalt. Photos 1-4 are from this project.

The second project required complete removal of old asphalt and installation of 3 inches of new asphalt. Photos 5- 7 are from this project.